SIRE Vetting and the Environmental Sections
SIRE’s environmental sections now decide tanker fixtures. The pre-vetting discipline: equipment, records, crew demonstration.
SIRE’s environmental sections now decide tanker fixtures. The pre-vetting discipline: equipment, records, crew demonstration.
Incinerator failures during long passages turn waste equipment into compliance problems. Burners, refractory and the test schedule.
Plastic that may never go overboard has to be stored on board. Volume audits, compaction and reception logistics.
Annex V segregation fails for structural reasons, not discipline. Bin placement, placards and the digital record at the source.
Multi-flag fleets face five interpretations of the same conventions. Requirements matrices, transfer playbooks and consolidation.
Off-spec bunker fuel claims live or die on the evidence chain. Sampling discipline, tiered testing and engineering causation.
PSC detentions follow a known failure surface: OWS, record books, STPs, ECA logging. The pre-vetting survey that walks it first.
From galley waste to energy: maceration, dewatering and thermal stabilization turn a MARPOL Annex V burden into storable fuel.
Annex II compliance is decided by stripping pumps and wash water heaters, not paperwork. The engineering behind prewash decisions.
Plastic pellets are now regulated cargo under MARPOL Annex III, with a mandatory code coming. Packaging, stowage and notification engineering.
Marine incinerators under MARPOL Annex VI Reg 16: what can be burned, sludge capacity engineering, and the burn-versus-recover economics.
Sewage treatment plants fail PSC for predictable reasons: sizing, biology, maintenance. A MARPOL Annex IV engineering review.